get in touch

Nakan Dam Pipe Grouting, East Kalimantan, Indonesia

THE PROJECT

The Nakan Dam, at the Kelian Equatorial Mining gold mine, in East Kalimantan, Indonesia was constructed to store 165 million tonnes of acid waste rock under 1 m of water. The project comprised four earth and rockfill embankments. The high level diversion conduit (HLDC) was built through one of these to provide runoff diversion. The HLDC included an inclined decant system up the upstream face of the saddle embankment with inlets at 10 m intervals to allow for incremental filling of the reservoir during waste dumping. A flow of approximately 50 L/s was observed, when the bellmouths were closed, indicating a leak had developed within the HLDC.

PSM was engaged to permanently seal the leak in the HLDC.

ENGINEERING AND TECHNICAL OPPORTUNITIES

The Nakan Dam is located in a remote region of Borneo, approximately 2 km south of the equator. It experiences high annual rainfall with an operating reservoir level of approximately 30 m head.

Permanent sealing (grouting) of the leak could not be undertaken without temporarily halting or reducing the flow. Working conditions were risky with a potentially low oxygen atmosphere and/or explosive environment within the HLDC and subsequent rise in reservoir level following sealing. The location of the leak within a pipe buried beneath 70 m height of the earth and rockfill embankment was unknown.

Other engineering and technical opportunities included:

  • The HLDC horizontal alignment was dog-legged to best follow the natural ground, further complicating the task of inserting and positioning the packer
  • Neutralisation of the acidic waters in the Nakan Dam reservoir, with the addition of lime, had resulted in a precipitate in the HLDC potentially risking the packer operation
  • Achieving grout length within the HLDC before the onset of initial set in the HLDC or supply lines.

APPROACH AND INNOVATION

Following a rigorous assessment, PSM’s tailored approach included:

  • Development of several potential solutions to manage the leak in the HLDC, including construction of a scaled model to assess whether the placement of graded gravel filter within the HLDC would sufficiently reduce flow
  • Use of flexible corrugated Helcor pipe joined with compression couplings in a gravel surround beneath the embankment’s upstream and downstream rockfill zones
  • Construction of a welded steel pipe in a rigid concrete surround through the central clay core and transition zones
  • Development of a bespoke 1 m diameter packer to temporarily seal the HLDC within the HLDC’s steel pipe section downstream of the supply lines, including testing of two full sized prototypes
  • Preparation of trial grout mixes to assess possible mix designs
  • Mobilisation of a team of construction divers to initially investigate the location of the leak, clean the steel pipe with scabbling hammers and position the packer immediately downstream of the supply lines 1 and 2
  • Mobilisation of grout agitator, high-flow grout pumps and ancillary equipment, materials and labour.

OUTCOME

PSM successfully permanently sealed a leaking 1 m diameter pipe located beneath a 70 m high earth and rockfill embankment. The design solution incorporated a bespoke 1 m diameter inflatable packer to seal the pipe outflow before displacing the water via a high-flow grouting operation.

Services: #bellmouth #coduitgrouting #embankment #equatorialgoldmine #HLDC #Indonesia #nakandam #pipegrouting

get in touch

Contact Us

For expert advice, reach out to our team today.

    SUBSCRIBE TO STAY IN TOUCH

    Receive the latest news and updates straight to your inbox.
    footer certificationfooter certificationfooter certification
    Technically Assured Organisation
    Locations

    Sydney

    G3, 56 Delhi Road
    North Ryde NSW 2113

    BRISBANE

    Level 6, 500 Queen St
    Brisbane Qld 4000

    PERTH

    Level 3, 22 Delhi St
    West Perth WA 6005

    MELBOURNE

    Shop 4, Suite 4, 23-31 Gheringhap Street
    Geelong VIC 3220
    Contact us
    Locations

    Sydney

    G3, 56 Delhi Road
    North Ryde NSW 2113

    BRISBANE

    Level 6, 500 Queen St
    Brisbane Qld 4000

    PERTH

    Level 3, 22 Delhi St
    West Perth WA 6005

    MELBOURNE

    Shop 4, Suite 4, 23-31 Gheringhap Street
    Geelong VIC 3220
    Contact us
    Footer Certification
    Footer AEC logo
    © Pells Sullivan Meynink